A silver light-rail train crosses an elevated guideway above rain-damp paving and autumn landscaping in a quiet Puget Sound suburb.

What Kent Des Moines Station Gives West Hill Buyers in Its First Year

Light rail reached Kent's West Hill on December 6, 2025, when Sound Transit opened the Federal Way Link Extension and its three new stations, one of them Kent Des Moines. The station sits elevated beside I-5 near SR 516 and South 236th Street, west of the freeway and east of Pacific Highway South, and it serves Highline College. As it nears its first anniversary, the station has given the area a reliable train and a reworked bus network. The homes, shops and walkable blocks planned around it are on a slower schedule that runs into 2028 and beyond.

That gap matters for anyone comparing West Hill with other parts of Kent. Right now a buyer near the station is paying for a commute. A finished station neighborhood comes later. This fall, they are doing it in a Kent market that has more listings and slower sales than a year ago.

The first year delivered the commute

The station's most visible piece is its parking garage. Before opening, Sound Transit described it as about 500 spaces, and the Kent Reporter counted 502 stalls along with restrooms inside the structure. In that December 2025 report, the paper said the garage would start out free and that paid parking was under study.

Buses caught up this summer. King County Metro's August 29, 2026 service change replaced Route 165 with two routes. Route 164 links Des Moines, Kent and Auburn. Route 166 runs at peak frequency between Burien and Kent Des Moines Station. The same change raised overnight RapidRide A Line service on Pacific Highway South to every 30 minutes. For a household on the West Hill, the station now connects to Burien, Auburn and the Pacific Highway corridor by bus.

Ridership is still modest. Using Sound Transit's ridership dashboard, The Urbanist reported that Kent Des Moines, Star Lake and Rainier Beach were the only stations west of Lake Washington below 2,500 average daily boardings in August 2026. Federal Way Downtown, two stops south at the end of the line, ranked tenth in the whole system. For a buyer, those boardings show where the station is in its life. Traffic at a station grows with the housing within walking distance of it, and that housing has not been built yet.

The blocks beside the station are on a later timetable

Sound Transit and the City of Kent have written down what they want next to the station. The Federal Way Link Extension development agreement commits Sound Transit to work with the city on redeveloping the North and South blocks at Kent Des Moines Station. The goal is a "mixed-income walkable urban center" on the agency's land. Here is where each piece stood in Sound Transit's first-quarter 2026 transit-oriented development report and in local reporting:

Site Plan Status and timing
Kent Multicultural Village 233 affordable homes, an early-learning center, family services and retail Broke ground March 18, 2026; build expected to take about two years
Kent Des Moines Station South TOD, about 2 acres To be determined Construction staging for Kent Multicultural Village; no development partner selected
Kent Des Moines Station West TOD, about 0.7 acres Not yet defined Vacant
3101 S. 240th St., 12.5 acres 564 market-rate apartments in 10 buildings by Pahlisch Commercial Permits filed as of March 2025; about a three-year build estimated

Kent Multicultural Village is the furthest along, and we covered it in more detail in our earlier look at the project. With a March 2026 start and a two-year build, it would finish around spring 2028.

The South block next to it has a longer history. Sound Transit closed its request for proposals in November 2023 without choosing a developer, because no proposal met the criteria closely enough. The agency now plans to offer the site again with the City of Kent, this time favoring market-rate housing, at a date it has not set. Until then, the land is the staging yard for the Multicultural Village build.

The largest market-rate plan is a quarter-mile away. In March 2025 the Kent Reporter described a $135 million, 564-unit apartment complex at 3101 S. 240th St. It is planned by Pahlisch Commercial through a project company called SUT 565. The developer had filed civil and building permits, and the paper reported an estimated three-year build.

Put together, the station-area plans add up to roughly 800 new homes across two projects with build times of two and three years, plus two Sound Transit parcels with no developer. That is the population that would fill the trains and support shops near the platform. It is planned for the late 2020s, and a buyer this winter should treat it that way.

What Kent's fall numbers say about timing

Meanwhile, the wider Kent market has turned in buyers' favor. In NWMLS's October 2026 area report, Map Area 330 recorded 76 single-family residential sales at a median of $672,500. In October 2025 the same area had 78 sales at a $700,000 median. Average time on market went from 49 days to 52. Area 330 is NWMLS's Kent area and covers the city as a whole, so it is a citywide reading and not a West Hill one.

Condominiums moved further. Kent's October 2026 condo sales came to 16 at a $320,450 median, compared with 25 sales at $376,000 in October 2025, and average days on market rose from 27 to 46. Condos are the type of home most often linked with living near transit, which makes this the more telling figure for the station area. It points to more choice and more room to negotiate. It does not point to a premium.

Supply explains a lot of it. At the end of October 2026, Kent had 302 active residential and condo listings against 93 pending sales, or 3.28 months of inventory. A year earlier there were 240 active listings. The county shows the same pattern. NWMLS put King County's October 2026 single-family median at $925,000, down 7.2% from October 2025. Our current market page has more on conditions across the area.

Reading a West Hill listing with this in mind

The trains run, the 164 and 166 bus routes reach the station, and the garage is built. Whether a particular home is close enough to use all of that is something you can check on a weekday morning before making an offer.

The housing planned beside the station runs on a separate schedule. Kent Multicultural Village is under construction with about two years to go, the South block has a stated intent and no developer, and the 564-unit apartment plan carries a build estimate of about three years. A buyer who pays extra today for a walkable station district is paying for something the record puts around 2028 or later. With citywide medians below last year's and listings up about a quarter, Kent buyers have room this fall to price a home on what is already built.

Sellers on the West Hill should think about the same timeline from their side. Being close to the station is a real selling point with a commuter buyer. Still, the same October figures show buyers taking longer and comparing more listings. A list price that reflects today's station, rather than the one planned for later, fits the current pace of Kent sales.

Quick answers

When did Kent Des Moines Station open? Sound Transit opened it December 6, 2025, as part of the Federal Way Link Extension.

Which buses connect to it now? Since King County Metro's August 29, 2026 service change, Route 166 runs between Burien and the station, and Route 164 links Des Moines, Kent and Auburn.

When could the first new homes next to the station be ready? Kent Multicultural Village broke ground in March 2026 on a build Sound Transit expects to take about two years.

Are Kent home prices up or down this fall? Down slightly. Kent's October 2026 single-family median was $672,500, compared with $700,000 in October 2025, according to NWMLS.

If you are weighing a West Hill home near the light rail, or wondering how buyers will value your home's distance from the station, Perkins & Associates | Joe Perkins is glad to talk it through with the October numbers and the station's timetable in hand. Start with a free home valuation, or visit our Kent neighborhood page to talk with the team.

Work With Us

Led by Joe Perkins, the team offers a refined and thoughtfully managed real estate experience. Each member brings specialized expertise—from strategic marketing to transaction coordination—ensuring every detail is handled with precision. With a shared commitment to excellence, the team provides seamless support at every stage.

Follow Me on Instagram